What ships inside the crate — and what stays with you as the importer.
Markets do not fail because a truck was badly built. They fail because a document was missing at the port. This page separates our paperwork from the obligations that sit on the importer.
Documents with every unit
| Document | What it covers |
|---|---|
| EU Declaration of Conformity | Which directive and standards the model was assessed against, with the serial range. |
| EN test reports | Static and dynamic stability, brake performance and overload testing by an accredited lab. |
| Technical file | Drawings, BOM, hydraulic and electrical schematics, risk assessment. |
| Operation & maintenance manual | In the destination language, including daily checks and the wear-part list. |
| UN38.3 test summary + MSDS | Lithium and lead-acid packs, required by the carrier before booking. |
| ISPM 15 treatment record | Heat-treated or fumigated solid-wood crating, stamped with the IPPC mark. |
Machinery Regulation (EU) 2023/1230
Replaces the Machinery Directive from 20 January 2027. Units shipped before that date fall under 2006/42/EC; units placed after it need the new declaration. We confirm which applies per order.
Who signs as manufacturer
If you sell under your own brand, the declaration, the technical file and the serial traceability become your responsibility. We supply the underlying evidence; we do not sign in your name.
Packaging EPR (Germany, France, Spain)
LUCID registration and the French Triman mark are importer obligations. Tell us the destination and we print the mark and the registration reference on the carton.
Before you place the first order
We ask every new distributor for three things, and we expect the same from ourselves: the target market and its standard, the load profile, and the address that will appear on the declaration. Orders without these are usually the ones that meet customs twice.